Clay drain road
I saw an ad for industrial land along 301. it mentioned Clay drain Road to become a four-lane road. Also had a graphic that said the turnpike to be expanded to eight lanes in the future at 301. Land is also available for development on 301 at the turnpike south exit ramp. Traffic already bad in the area
Last edited by Babubhat; 10-01-2024 at 03:44 PM.
|