In 1993 that was code to have a metal plate over any wire that was passed through a stud. I would contact the warrenty department and seek reimbursement. And if they don't want to do that, perhaps they need to consider removing all the dry wall in all the CYV to see if there were metal plates installed. I will go back in my code books to see when this was implemented, but I am pretty sure it was sometime in the mid 80's.
__________________
Life is to short to drink cheap wine.
|