Quote:
Originally Posted by Sandy and Ed
Ditto!!! The infrastructure in this place is amazing. The cleanup effort after the storm is amazing. Kudos to the water management folks and to those that control all the water pumping stations that regulate the distribution of water throughout the villages
|
Agree, the workers are doing a great job replanting trees, collecting and filling hundreds of dump trucks with debris to be hauled away.
Watching the new construction, they spend close to two years building the storm water systems.
I would not be surprised if 20-30% of our bond cost is to build those systems.