Quote:
Originally Posted by Ignatz
Actually the first crane arrived last March. Since then a matching crane arrived and more recently a much larger crane joined the group. Now one of the smaller pair is no longer there.
As another poster stated, they are expanding the turnpike and 470 as well.
Whether there will be golf cart access over the new bridge is the subject of speculation and building plans that are being held very close to the vest by those in charge.
|
I was riding my bike by there the other day when they were moving those cranes around and I stopped and asked the guy what the plan was. He said he wasn't sure what the configuration was going to be but it was going to be wide enough that at least six lanes could be built over the turnpike.