Quote:
Originally Posted by biggamefish1
Two questions, one you do not have to remove the existing baseboard with whatever flooring you choose to use. They will use 1/4 round molding to transition your new flooring to your baseboard. They will remove the existing scribe trim at any cabinetry and reinstall it again on the new flooring you select. Second, if you choose wood or LVP they don't have to remove the vinyl, the new floor will float over your existing vinyl. With tile I am sure they can prep the vinyl floor to accept the tile flooring and float out the transition of the vinyl edge to the concrete slab and make it work. There are usually two sizes of quarter round to pick from, use the smallest they offer. If it was my home and I went with all tile I would have them remove all of the baseboard and supply and install new on top of the tile unless you were to op to taller base where you can tile up to and not lose the height .
|
not a great method, pretty cheap and fast and crap on the value (ROI)
__________________
Never give up, Never surrender.... just take your prisoners with you
|