OUR PRIORITIZED LIST- 1. Replace Carpeting (3BR) with LVP (We did LVP throughout during the Design meeting)
- 2. Epoxy Garage Floor (We did polyaspartic/polyurea instead of epoxy; Had this done the day of closing)
- 3. Install Whole House Water Softener, Kitchen Reverse Osmosis (Culligan?) (We installed Nova filter day after closing)
- 4. Purchase/Connect Washer/Dryer and Gas Range (List TV Install for Resale) (We did the washer/dryer combo to save space)
- 5. Improve Insulation, Whole House (including Garage and Lanai) (garage insulation done a week after closing)
- 6. Install Whole House Gutters (will be done tomorrow by Stipes!)
- 7. Install Garage Attic Stairs (installed by Stipes)
- 8. Build Pantry (in Kitchen Nook, Monroe Model) (done by Kitchenwise/Closetwise)
- 9. Touchups (Backsplash, Painting, Lighting, Ceiling Fans[/COLOR] (builder says this has to be done within a week after closing)
- Security cameras
- Alarm system
|