Quote:
Originally Posted by Elixir34 View Post
NOT two years to refuel a commercial reactor. Average three weeks. I worked at a plant that was refueled in 17 days. Then it ran at 100% power for 710 consecutive days before the next refueling.
The plan is to just swap them out.