
09-24-2025, 11:01 AM
|
Senior Member
|
Join Date: Dec 2011
Location: Dover, NH, Village of Buttonwood
Posts: 482
Thanks: 29
Thanked 216 Times in 122 Posts
|
|
Quote:
Originally Posted by villagetinker
I wish I could help you, but I did my own, at the time (a few years ago) most of the installers wanted the room(s) cleared to install the new flooring and, in our case, there was NO room to do this, and the disassembly of the king size bed alone was a major problem. I was able to do the work in 2 weeks, 2 to 4 hours at a time and kept the rooms fully operational the entire time. This was 2 bedrooms, 3 closets, and one hallway.
|
You mean these companies don’t move furniture and stuff? Man I hope that has changed!
|
The Following User Says Thank You to daca55 For This Useful Post:
|
|
|