Originally Posted by twalk View Post
You made some great points. What about putting in sound barriers and other controls as outline below at the plant and setting distance to 1.25 miles?

"For a large-scale data center equipped with specialized low-frequency sound barriers, the minimum distance to ensure no one can detect the sound—even at night with open windows and no buildings in between—is roughly 1 to 1.25 miles away.

Why 1 to 1.25 Miles Is the Minimum Threshold

Low-Frequency Mitigation: Standard sound walls only block mid-to-high pitches, whereas specialized low-frequency controls (such as tuned exhaust silencers, thick mass-loaded parapet walls, closed-loop liquid cooling, and low-RPM fans) knock down the deep mechanical hum right at the source.
• Open-Terrain Decay: Without houses or hills in between to scatter the remaining sound waves, it still takes about a full mile of open air for the muffled low-frequency energy to drop below 30 dBA—the quietest nighttime indoor background threshold.
• Weather Margin: Staying at least 1 to 1.25 miles away ensures the facility remains undetectable even during calm nighttime temperature inversions, when cool air carries sound farthest across flat ground"
Did you also read post #62? None of the posts here related to noise say anything about what is _reasonably_ expected at the proposed data center in Sumter County.

This thread has a lot of generalizations going both ways about noise.

Does anyone have the actual plan details of the south Sumter proposal? Without actual plan details, a lot to folks are just speculating what might be coming to Sumter.