Thread
:
electric bill
View Single Post
09-21-2010, 08:25 AM
mulligan
Sage
Join Date: Sep 2008
Posts: 2,989
Thanks: 17
Thanked 349 Times in 156 Posts
Normally, the power co. cannot install a meter until after the final inspection of the home, and the meter on the temporary power panel is in the name of the general contractor.
__________________
........American by birth....Union by choice
mulligan
View Public Profile
Send a private message to mulligan
Find all posts by mulligan