
03-20-2011, 04:51 PM
|
Sage
|
Join Date: Sep 2010
Location: Granville, OH.....and TV snowflakes!
Posts: 6,891
Thanks: 0
Thanked 2 Times in 2 Posts
|
|
Quote:
Originally Posted by mulligan
According to seco, you must leave 10' clear in front of the door side, and 3' clear on all other sides. This is a safety requirement. The service people operate the switches inside with a long pole, and need the room to work unhindered.
|
To confirm mulligan's post, here the info noted from SECO's web site:
http://www.secoenergy.com/planting.html
Bill
|