Quote:
Originally Posted by CTgolfer
My thoughts are that Spec built houses (new construction) should be totally stopped.
|
I somehow doubt The Developer will halt new construction.  There is still water in some of the retention ponds and golf course watering seems to be continuing. All the lawns are still looking good.
The current water restrictions are in place until the end of June. Hopefully during the summer, the rainy season will fill up the retention ponds again.
__________________
Barefoot At Last
No act of kindness, no matter how small, is ever wasted.
Saving one dog will not change the world, but surely for that one dog, the world will change forever.
|