Quote:
Originally Posted by jimbo2012
Not being there must be raising your anxiety level I suppose.
We have our design date of 12/13...assuming the 15th we sign off they should begin just before or after Christmas.
We'll be there by Dec 1st, but will go back for the holiday, returning the 27th, just in time to bug the builder everyday during the build.
Sitting here in NY on a cool rainy day sketching the master bath, I now have 4 versions.
Next is the front bedrooms thinking about bumping (30") out BD #2 even across with bd #1, that's easy.
See floor plan
The standard plan would just be having a straight across facade with two flat dbl windows on each.
Was thinking perhaps of a bow window on bd # 2 with a witches hat?
Or just two bows one on each bdrm.
Any ideas welcome
|
I think you will be happy with as many stretches as you can.If you choose to make the 2 bedrooms straight across the front, I would do something to give that area some differentiation. I would put a straight bay in one of them only, both for character and the fact that the straight bay allows for more space. I chose that for my front bedroom, but that was just what I liked. You may very well differ on that!
So excited for you and can't believe you have 4 sketches for the master bath! You are better at thinking that through than I am

I think in hindsight I may have made 2 smal changes, one structural, but too late now! In the end result I know I will be thrilled wth the outcome.
I am so excited for everyone building and it will be most interesting to see all the changes and how our homes differ and complimet each owner!
__________________
Wherever I am is where I'm supposed to be