Design meeting
Finally decided on the Lantana. Was shocked all 14 of my requested changes were approved (thanks Jeannie Ulmer). Two foot bump across MBR, LR, Nook. Six foot bump to enlarge the MBR closet across the back of the MBR bath to the outside wall and across through the dinning room, pantry/garage. Four foot bump through Nook, kitchen and pantry (former laundry room) to allow island in kitchen. Also gained a 48" cabinet on both sides of kitchen. Added a work shop (separate room about 10' x 10') behind GC garage. Extended lanai across entire width of back of home and 16' out back. Replaced sliders with French doors in
LR. These are some of the major changes. For those of you who have not had your design meetings, we were allowed to delete the dish washer, oven, refrigerator and microwave for credit. We also moved the laundry and deep sink into the garage. We did home and Summer kitchen design yesterday and bird cage and the area inside the cage today. Tomorrow we pick fixtures, etc. The only request not approved was the elevation D we liked. Seems they have quit mfg the structures required for that elevation since our last visit. Hope to see some of you tonight at 8PM.
|