Quote:
Originally Posted by jimbo2012
Well the moisture test is done on the concrete, it was not too bad now I know which glue to order.
The wood is acclimating comfortably getting into frog mode.
I also bought wood for part of the ceiling and the kitchen nook to be installed chair rail height. A bit of a pain around two windows and two receptacles, but it looks pretty good.
While waiting to the glue I completed the Kitchen nook, ceiling is about 1/3 done should finish tomorrow, fun working on scaffold, why is when you get to high point you always realize you forgot something out of your reach and have to climb down.
I setup my radial arm saw on casters and roll it our of the garage to just outside the front door, all the cypress saw dust goes into the pine straw for added mulch.
Before the floor is laid I want to paint one wall and also paint the 10' home theater screen on the opposite wall, that needs to be sprayed, Also need to clear coat the ceiling.
so I want all that done before the wood is put down.
|
I think you should have an "Open House" Jimbo, so we can watch the whole project as you install step by step!!!!!!!