Quote:
Originally Posted by A-4 Skyhawk
We signed on the 12th and they surveyed and staked the lot on the 23rd. Broke ground on the 25th
|
We signed 12/14 and we got pix of the strings on the 23rd. When we saw it over last weekend the Sheetrock was complete, painting done, the tile grout was in the garage. Pix yesterday showed the driveway and the lanai floor poured. 29 days more....
I love we are sharing so many similar experiences ... We can share stories and laugh ...and us Gillys sure are starting to have a lot to laugh about ...
Good luck on the build