Our design meeting is scheduled to begin March 4 th 9 am. We still don't have a designer assigned so a couple basic questions:
1. Summer kitchen thru builder vs after build costs and will the builder rough in the propane connection, elect and water?
Any recommendations on post build contractors?

2. How long are we at the design center each day?

3. Anyone care to comment on pool being on the NE back corner on house vs. NW back corner?

4. Who is the cabinet maker/company?

Thanks from Houston - No problems here we're coming to TV!
rwlinn,

Summer kitchen is less expensive if you build it later but the down side is you will need to deal with the construction, vendors, noise and dust. Either way, ensure the wiring and plumbing is in place during new construction.

You are only actually at the design center for short periods of time. Most of our time was spent walking through models looking at different designs and finishes.

I think you would want the pool in a south exposure for the winter sun and protection from the north wind. If your two choices are NE and NW it would depend on if you like the sun on the pool in the afternoon (NW) or morning (NE).

You should check out a thread on TOTV titled New Villagers of Gilchrist which has lots of this type of information.