I had a dig plan but it needed some tweaking, in the meantime I installed the Spa in ground built the forms for the concrete base to build an enclosed pergola rather than a bird cage.
Ran all the electrical and got my first building dept approval Monday.
Today did all the plumbing on the pool itself should be ready to drop it in the ground tomorrow or Thursday.
Oh fun, I did tweak my knee 2 weeks ago that slowed me down a bit, but it's almost better.
In between all this did most of the landscaping.
__________________
Nova Water filters
|