Talk of The Villages Florida - View Single Post - New Villagers in Gilchrist
View Single Post
 
Old 06-06-2013, 03:29 PM
dotti105's Avatar
dotti105 dotti105 is offline
Gold member
Join Date: Aug 2012
Location: The Village of Gilchrist, fulltime
Posts: 1,088
Thanks: 98
Thanked 12 Times in 8 Posts
Default

Just about to put a deposit down on lot 109 in section 211.
1606 Gullberry Place. Lanai will face Pinellas and the 8th green is directly behind us. Very excited. But confused about the timeframe for building.
Is this right?
-$7500 deposit to hold lot, sign contract to purchase lot
-6 mo to choose house and have design meeting and give the remainder of 20% of total home
-closing date set at design meeting, according to builders schedule. (60-75 days out)
Is this correct? Our sales person is on vacation so I'm not sure of the timeframe.
She said something about coming back after the $7500/contract for lot. To make preliminary choices. It sounded like she wanted the 20% then. But I thought we had 6 mo from contract date.
Can anyone clarify? Thanks!! We live in Utah and airfare ain't cheap this time of year. Hoping we just have to return for design appt.
thanks, neighbors!!!

Last edited by dotti105; 06-10-2013 at 09:18 PM. Reason: address correction