Quote:
Originally Posted by dotti105
Just about to put a deposit down on lot 109 in section 211.
2606? Gullberry. Lanai will face pinellas and the 8th green is directly behind us. Very excited. But confused about the timeframe for building.
Is this right?
-$7500 deposit to hold lot, sign contract to purchase lot
-6 mo to choose house and have design meeting and give the remainder of 20% of total home
-closing date set at design meeting, according to builders schedule. (60-75 days out)
Is this correct? Our sales person is on vacation so I'm not sure of the timeframe.
She said something about coming back after the $7500/contract for lot. To make preliminary choices. It sounded like she wanted the 20% then. But I thought we had 6 mo from contract date.
Can anyone clarify? Thanks!! We live in Utah and airfare ain't cheap this time of year. Hoping we just have to return for design appt.
thanks, neighbors!!!
|
Hi Dottie! I'm not sure of the current criteria for homes. The $7500 deposit sounds correct but I believe that I've been told that build time from deposit to build may be 3 mos for those on a golf course. I'm assuming you'll get a design date once you put down the deposit. After design (2-3 days in length) you'll be given a build date. Building does start on time. Near the end of the build you'll be given a closing date when you'll bring the remainder of the money. At least that's how I remember it happening. I'm sure that some of the newer members on the site will be able to give you the most current scoop.
Good Luck!