The precast wall was ALL installed on the early morning of Saturday 8/10/13.

The installation included a center precast "H" frame to slide the 2 wall sections into. The center H frame was attached to a drilled cast in place concrete pier - that was installed that same morning. The pier probably needed at least 7 days cure time before it could properly support the approx 6,000 Lbs or so of the two precast panels.

I wonder what licensed structural engineer approved the installation in one day - and maybe the Town of Lady Lake will also.

PS: Stand back of the wall for a few more days in a stiff wind.

.
__________________
Da Chicago So Side; The Village of Park Forest, IL; 3/7 Cav, 3rd Inf Div, Schweinfurt, Ger 65-66; MACV J12 Saigon 66-67; San Leandro, Hayward & Union City, CA (San Francisco East Bay Area) GO DUBS ! (aka W's)