Quote:
Originally Posted by BettyCrocked
That option does me no good whatsoever. Plus, I wouldn't pay someone to do something I can do myself.
I'm just looking for what is in the picture in the link I posted.
|
I've seen floor drains similar to the one you referenced in
Sparr Building and Farm Supply on CR 44--if you intend to do the job yourself.
Two weeks is a very tight timetable to engage a contractor or handyman. Time may be on your side because the rainy season is past and the lanai is covered. How often have you seen standing water in the lanai?