Today when I was northbound on 301 and looked east down 466A, I saw concrete curbs in place and the street area was flatten. A couple of months ago when I had last looked down 466A, the street was a big hole. So, apparently whatever pipes that needed burying are in place. I don't know how far the curbing is done, or if it's finished. Next should probably be the road base and then some paving, stripping and signage.
|