Quote:
Originally Posted by kittygilchrist
My theory that as seco adds new service to areas under construction, the impacts in grid power must temporarily phase in the alteration in total output to equalize demand. Simply, it is molecular thermodynamics of fluid phase equlibria.

What's your theory?
|
With Degrees in Thermodynamics, Electrical Engineering,
Biomedical Engineering, Petroleum Engineering
and Aerospace Engineering
my spawn may tend to go with your theory.
They may even understand what you presented.
As just a simple semi-retired dirt Farmer with a few Feeder Cattle
along with a side order of Tree Farm, I like your analysis.
I will also go with your theory.