Talk of The Villages Florida - View Single Post - 466A to 301
Thread: 466A to 301
View Single Post
 
Old 12-01-2014, 06:47 PM
dolpterry dolpterry is offline
Senior Member
Join Date: Dec 2007
Posts: 154
Thanks: 1
Thanked 0 Times in 0 Posts
Default

There was a 3 month delay because of right of way zoning. The main problem was moving the gas lines. Should be done by March.