02-23-2015, 05:39 PM
i hired Corban Construction to replace my lanai with an addition. The project was to take 2 months after construction began. It took over 5 months.
Delays resulted from: lack of attention to the written contract and attached architectural drawings approved by the TV-ARC and Sumter Co. Bldg Dept; in attention to details; failure to order the windows and door timely; lack of supervision during work; and lack of quality-checks after completion of a stage in construction, such as concrete, electrical, plumbing, wallboard and spray-texture, siding, and etc. Additional delays resulted from a lack of or poor inspection of products prior to their installation; i.e., products that were damaged or wrong/poor quality were installed, then removed after homeowner's complaints and good replacements installed.
The owner is a nice guy, but being nice doesn't mean the work is good or on time.
Delays resulted from: lack of attention to the written contract and attached architectural drawings approved by the TV-ARC and Sumter Co. Bldg Dept; in attention to details; failure to order the windows and door timely; lack of supervision during work; and lack of quality-checks after completion of a stage in construction, such as concrete, electrical, plumbing, wallboard and spray-texture, siding, and etc. Additional delays resulted from a lack of or poor inspection of products prior to their installation; i.e., products that were damaged or wrong/poor quality were installed, then removed after homeowner's complaints and good replacements installed.
The owner is a nice guy, but being nice doesn't mean the work is good or on time.