On September 21, 2015 the Multi-Modal Path Discussion Group (MMPDG) met to discuss the Technical Memorandum prepared by Kimley Horn & Associates (Engineer) related to the multi-modal paths. The memorandum specifically addressed striping and reflective pavement markings for the following areas:
• Medians
• Geometrically constrained locations
• Trail-side obstructions
• Roundabouts
The Engineer conducted the field analysis using a GPS enabled device to map all locations where improvements are recommended.
The MMPDG reviewed and discussed the findings and provided unanimous support for implementation.
If you would like to view the memorandum prepared by the Engineer, please click here (http://www.districtgov.org/PDFView/PDFMeeting.aspx?id=20150921ot0201).
More... (http://www.districtgov.org/PdfView/PdfView.aspx?path='/PdfUpload/MultiUse Trail Marking_KHA Report 6.22.15.pdf'&ql=standard)
• Medians
• Geometrically constrained locations
• Trail-side obstructions
• Roundabouts
The Engineer conducted the field analysis using a GPS enabled device to map all locations where improvements are recommended.
The MMPDG reviewed and discussed the findings and provided unanimous support for implementation.