Log in

View Full Version : Paradise Rec Center Status March 8 2023


rustyp
03-09-2023, 01:49 PM
Paradise Recreation Project Status
• Concept Design, which is based on existing Regional Recreation
Center plans. Adds 10,000 Square Feet to current Paradise
Footprint & eliminates multiple elevation floorplans;
• Potentially save $400-500K by utilizing already approved Regional
Recreation Center construction plans (with some modifications to
enhance views & expand/optimize space use & layout);
• Adds New Amenities: Natural Gas Fire Pit with Lake Overlook &
Picnic Area, Walking Trail, and a Resort Style Pool;
• Provides dramatic views and overlook areas above Golfview Lake;
• Preserves all of the historic majestic Live Oaks;
• Improves grade and functionality of all interior spaces;
• Maximize the views over the lake (fire pit, expanded seating
and picnic areas, large plate glass overlook windows in key
areas);
• Expands the Mark Twain Library Space;
• Maintains the Spanish architecture and historic look and feel
of the original Paradise Recreation Center