View Full Version : Work scheduled for Saddlebrook multi-modal path
The Gazette
06-05-2024, 01:20 PM
District Property Management will be performing repairs along the multi-modal path between the south side of Saddlebrook Recreation Center to the north side of Tunnel B10 (under Country Road 466). The multi-modal path will be blocked off and a detour will be visibly marked. The detour will run along the concrete pathway of the Saddlebrook
More... (https://www.gazettenewsthevillages.com/work-scheduled-for-saddlebrook-multi-modal-path/)
almondz
06-06-2024, 01:14 PM
Good - that is the prettiest path in TV but the surface is a disaster. And can't blame pot holes on tree roots. It needs resurfaced, not just patched evey 3-4 months. The patches have not held up and are sometimes as rough as before the patching. Perhaps a contractor problem.
Bay Kid
06-07-2024, 07:47 AM
Good - that is the prettiest path in TV but the surface is a disaster. And can't blame pot holes on tree roots. It needs resurfaced, not just patched evey 3-4 months. The patches have not held up and are sometimes as rough as before the patching. Perhaps a contractor problem.
Hopefully they will repave the entire path, not patch.