![]() |
Thanks for the pictures AJ and Caly,:doggie:
We will be back in TV in 11 days and can't wait to see all the changes, it never fails to amaze us since the last time we were there. Counting down the days till our return to The Bubble. :pepper2::pepper2: |
Note that this tunnel under Morse is unique in that it is above ground level, and Morse will go up and over it. All other tunnels that I know you have to go down, through the tunnel, then back up to ground level.
|
Thanks for the pictures. It is amazing how fast everything is built in TV.
|
Quote:
Interesting satellite shots of Lake Sumter Landing on Google Earth. |
New to the site and TV. Just bought in Hemingway. Anyway I was involved with a project like this a few years back and can tell you it comes in sections and put together on site. In some places they can only go down so far and then grade over and you wont even know that it was never down below grade.
|
And the beat goes on.... Morse south of 466A
It is getting hard to remember the original grade of this land already! Was getting dark, but can still make out changes.....
Looking north towards 466A from the first round-about where Sarasota range will eventually be. If you look to the left you can make out the cart path. http://i1002.photobucket.com/albums/...v/IMG_0243.jpg We had to take that path so we could see the tunnel. This is looking south with 466A at my back. http://i1002.photobucket.com/albums/...v/IMG_0249.jpg |
And the beat keeps going on
Tunnel looks like it was always there, check out original post (#1). Last night I swear I saw them starting houses, wowser....
http://i1002.photobucket.com/albums/...P1030828-1.jpg Hard to tell from photo, but the cart path is completely done on west side of Morse all the way to rotary. http://i1002.photobucket.com/albums/...v/P1030839.jpg |
Quote:
Note: Sorry, I missed that there were still several posting to read before making this posting. Maybe I'll wake up after I have my breakfast!:mornincoffee: |
Homes south of 466A
Spoke to a contractor involved in new construction. They have received blueprints already and expect to start construction on a new model center south of 466A within 30 days. Probably in the new "Village of Sanibel" The entry signs for which are already in place at the first traffic circle on Morse opposite the new fire headquarters.
|
I love stuff like this...so interesting to see how it's put together...
|
Me too!!
Quote:
|
Keep the pictures coming ajbrown! So very, very interesting. Thanks for posting.
|
Quote:
|
Quote:
I am not a photographer, just a guy out for a ride in the golf cart on a lovely evening that has a camera. Here are some shots from Sanibel which I had posted on another thread. http://s1002.photobucket.com/albums/...view=slideshow |
More from contractors. They have started what will be a 39 unit model center. Plumbers and electricians have been working and slabs are being poured.
|
All times are GMT -5. The time now is 07:43 AM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by
DragonByte SEO v2.0.32 (Pro) -
vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.