Completion of 466a
Hi all... Just wondering if 466a is now open between Powell and 301.
|
no it is not still has a detour
|
|
Yes it is open as I went through that way early this morning.
But it is a long way from being done. Still cones separating everything except the outside left and right lanes....one in each direction. The islands are not done. The paving is not done. Open but not done! All they did was create a passage through the construction zone. |
Quote:
|
Going east from 301 it's open but hardly a smooth ride.
|
I still saw the "Road Closed" sign up, this morning, at the 466A/Powell Rd intersection.
|
Below 466A it's easier to go 44A.
|
Quote:
|
That contractor should be ashamed of this job. It's still a mess, but yes open
|
Quote:
A contractor "ashamed" ? It seems you have no construction industry exposure. [emoji57] |
Seems like not enough "RESEARCH" was done before AWARDING this contractor with the project. Does this have to be approved by the county before being open to traffic??
No penalties assessed?? Might be a lesson in here someplace. |
Quote:
|
It's open. It's over. I'm glad. Now they can close the RR tracks on 462 for three weeks or longer, and I can still get to DDRR without detouring to Huey-Dooey-Looey St.
|
Its easier to take 462 to 301
|
Quote:
|
Quote:
|
Quote:
|
The contractor for this job is DAB construction. The same contractor who did the infamous never-ending widening of 441/27. 466a still needs to have the final coat of asphalt applied, and then final lane marking painting done. So, we can all anticipate more times of lane closures and mess on this "completed" road.
|
And it goes on and on and on and on!!!
|
|
Drove down 466a toady even though it said closed but it was open. What a joke. Lots left to do after 1 1/2 years. Side walks not finished in many areas. Road paving needed in some area. Barrels in several area. Looks like another year or so of work based on their previous track record. Hard to believe.
|
I'm so happy it's open, no matter how long it takes for the final touches. I appreciate it three times a week when running the pooch up to DDRR. It's much more direct to 301 than taking 462, and no trains.
|
Completion of 466a
Quote:
|
I am always amazed at how quickly TV moves in building and construction contracting. It is not a perfect science. I come from Staten Island NY and they have been working on the expressway for 13 years and it is still not completed. I agree that a construction project should have a beginning and a realistic end with a little buffer time to allot for the unexpected...After living in TV for less than 3 week,s as a frog, I see how this project directly effects movement and travel. I also have been advised that during winter months (high season) travel is especially difficult. I have no knowledge of the original plans or completion time.. all I can say is that it is far worse in different areas on the country.. of course that is why we are living in the best place anyone could possibly retire.. TV :pepper2::pepper2::pepper2::pepper2:
|
Quote:
|
One of the worst road jobs I have seen. I think they forced it open to possibly avoid contract penalties.
|
All times are GMT -5. The time now is 12:26 PM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by
DragonByte SEO v2.0.32 (Pro) -
vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.