![]() |
Courtyard Villas VS Cottages Homes Energy use.
I've heard all positives about the energy efficiency of Courtyard Villas from those who own them. Can any Cottage homeowners reflect on their energy use experiences?
|
They told me when I bought my cottage that it was a courtyard villa, with a yard. Same floor plan. :wave:
|
Quote:
|
We Have been in a Foxglove cyv for 9 months. With the thermostat at 78 all summer, our electric bills have been in the $120 to $135 monthly range. Our heat, cook stove, water heater and dryer are gas. That bill runs $20 to $30 in the summer. During the winter gas bill runs a high of $75 and the electric bill drops to about $50. VCDD runs us about $205 per month. We like to be comfortable and these utilities are so much lower than we had in NC we don't feel like we have to shiver or sweat! The foxglove is cement/stucco. Hope this helps
|
I'm sure that is right. Concrete is a pretty good insulator. But, there are many sided villas. So the only difference is the concrete. If you pay that extra ten to fifteen thousand for a concrete villa, it will take a lot of years to recoupe in utilities. At my age I probably would not ever get there.
|
We purchased a new masonry CYV last July, we just had our one year anniversary. We have a 2BR 2BA 'Woodlawn', it's now called a 'Durham'. The only difference is the front porch overhang is 10' instead of 5', it goes out past the front bedroom window. The interior only difference is they now have tray ceilings in the bedrooms instead of a vaulted ceiling, which I actually like better.
We paid $156,900 and I think we got a pretty good deal. In fact of the 88 villas in our section, ours was the cheapest. The average price of a 2BR was $164,000 to $169,000 and overall the average was between $179,000 to $210,000 and a couple of units hit $225,000. We started last year by keeping our A/C on 80 degrees then eventually 81. This year we keep it at about 83 degrees, any lower and it gets too cold. We have total electric everything and our bills have averaged about $92 a month until July when it hit $117. Our amenities/sewer/water/irrigation/garbage monthly bill was about $207 but lately they've been about $215. http://www.thevillages.com/homes/new...01202190_1.jpg |
Quote:
|
Quote:
|
Bought a cottage home "Tuckett" (3 bdrms.) Nov.of 2011 in the village of St. James & we are snow birds.
In the winter the air is @ 76 & the bill is in the mid $70.'S. May - Nov. the dehumidistat is set @ 60 & 85 & the last 2 bills were in the lo$20's. Home ia ALL ELECTRIC & we have a solar attic fan. |
Quote:
|
John W
I do not currently live in the Villages, just doing my due diligence and research about a possible move to TV. You posted: Our amenities/sewer/water/irrigation/garbage monthly bill was about $207 but lately they've been about $215 Is this per quarter? Or per month. Please explain. Thanks JS |
Quote:
|
Quote:
|
After the sun goes down, the concrete holds heat. That is good in the winter and not so good in the summer.
Don |
Quote:
We also had a screen installed on our garage door opening about a month ago and I now open the attic steps about a foot from the ceiling. I now can feel a nice breeze going up into the attic when I stand near the attic entrance. Since we installed the garage screen we have since set our inside temperature on 84 degrees, it's hard to believe because I'm normally a hot person. |
Quote:
Yes, we are originally from Baltimore. Yeah, years (31) ago when we first got married BG&E bills were reasonable. We currently live in Pennsylvania and we are with Met-Ed which is cheaper than BG&E but still no where near as low as you are describing in Florida. I sure do look forward to one day having those low utility bills. :pepper2: |
" We just had plantation shutters installed yesterday so we might even have a lower bill, our house is very bright inside so we wanted to control the brightness little more. "
John, who did you use for the shutters? Are you happy with them? I am hoping to do the same. |
Quote:
|
Quote:
They came out and they gave us some choices. We could of had them in 3 weeks from a company called Legacy I believe in Orlando. We had shutters in our Baltimore home by a company called Norman. He said they handled Norman, they would be cheaper but take about 8 weeks. We had been here 10 months already and since we weren't in a big hurry and we knew Norman was very nice, so we went that route. They actually took 9 weeks but they came and installed yesterday and they look great. Get the faux finish and not the real wood, they actually look better and are cheaper. |
Quote:
|
All times are GMT -5. The time now is 11:11 PM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by
DragonByte SEO v2.0.32 (Pro) -
vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.