Talk of The Villages Florida

Talk of The Villages Florida (https://www.talkofthevillages.com/forums/)
-   The Villages, Florida, General Discussion (https://www.talkofthevillages.com/forums/villages-florida-general-discussion-73/)
-   -   New interchange on Turnpike to be built and funded by The Villages. (https://www.talkofthevillages.com/forums/villages-florida-general-discussion-73/new-interchange-turnpike-built-funded-villages-103063/)

graciegirl 01-29-2014 07:20 AM

New interchange on Turnpike to be built and funded by The Villages.
 
The new interchange will be located approximately five miles north of the County Road 470 interchange and approximately four miles south of the U.S. 301 interchange.

Papa 01-29-2014 07:25 AM

link to pdf of the study w/ drawings
 
here's a link to the original study:

http://www.sumtercountyfl.gov/Agenda...0_952_1046.pdf

JP 01-29-2014 07:53 AM

I've always thought that CR468 would be the logical choice for where TV would continue developing south since there is so much vacant land down that way. It basically would connect right into Morse Blvd and make Morse Blvd THE highway exit for people coming to TV. How appropriate from the developers standpoint.

kittygilchrist 01-29-2014 08:44 AM

I heard this first from (my) Pastor Gary Washburn of Grace Tabernacle Church located in what was once a cow pasture, on 468 between the turnpike new exit and the place we assume will be connecting point on 44 for Morse.

Bogie Shooter 01-29-2014 08:50 AM

The fact that there will be an interchange is old news.
What is now being reported, The Villages is beginning the clearing of the interchange property. The proposal of long ago is now becoming realty.

gomoho 01-29-2014 09:32 AM

Could someone please enlighten me - what benefit does this have to the developer of The Villages if the intent is not to build out that far?

kittygilchrist 01-29-2014 10:10 AM

Drink some koolaid, gomoho, it keeps us Bubblers from asking too many questions.

jhrc4 01-29-2014 11:41 AM

Quote:

Originally Posted by Papa (Post 820173)
here's a link to the original study:

http://www.sumtercountyfl.gov/Agenda...0_952_1046.pdf

Now this is what I call an Excellent response total 1st Class TOTV let's this happen, and the individual who took the time to do this is really Outstanding!!

Thank You

Mallory 01-29-2014 12:26 PM

Not sure of the age of the K-H report and drawings but it looks like the concept of northbound off / southbound on is back on the table for Phase 1.

JMEZARIC3 01-29-2014 01:18 PM

Turnpike exchange
 
Quote:

Originally Posted by graciegirl (Post 820171)
The new interchange will be located approximately five miles north of the County Road 470 interchange and approximately four miles south of the U.S. 301 interchange.

Is the developer using his money or our money for this project?The exchange will not benefit me so I hope I am not paying for it.

Bogie Shooter 01-29-2014 01:53 PM

Quote:

Originally Posted by JMEZARIC3 (Post 820402)
Is the developer using his money or our money for this project?The exchange will not benefit me so I hope I am not paying for it.

He is using what was once your money.
No, your ammenity fees are not being used.

JB in TV 01-29-2014 02:30 PM

Do we know about any proposed time frames? I see on the study that was linked above a date of 2034. That's still 20 year from now if my math skills are still intact. :laugh:

champion6 01-29-2014 02:39 PM

Quote:

Originally Posted by JB in TV (Post 820451)
Do we know about any proposed time frames?

It has already started. Quote from an online local news source: "The Villages has begun clearing away brush in advance of its construction of the new interchange at the existing crossing of CR 468 over Florida's Turnpike in Sumter County."

janmcn 01-29-2014 02:45 PM

Quote:

Originally Posted by champion6 (Post 820456)
It has already started. Quote from an online local news source: "The Villages has begun clearing away brush in advance of its construction of the new interchange at the existing crossing of CR 468 over Florida's Turnpike in Sumter County."


I think what we all want to know is when will it be completed and open to traffic?

Bogie Shooter 01-29-2014 02:53 PM

Not by Valentines Day!:laugh:


There was no time frame as a part of the announcement, other than the following;

The extension of Morse Boulevard to State Road 44 is planned to be completed concurrently with construction of the proposed interchange. Sumter County also plans to widen CR 468 from two lanes to four-lane divided between SR 44 and the proposed Turnpike interchange


All times are GMT -5. The time now is 06:36 AM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO v2.0.32 (Pro) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.