How long before you should add a finish to concrete floor in lanai?
My wife and I recently bought a brand new house in The Villages. The floor in the lanai is just raw concrete and not so attractive. We'd like to put a nice finish on it and have gone as far as getting bids from some providers recommended by members of TOTV. A friend, who is NO expert on concrete and doesn't pretend to be, brought up the idea she'd heard that you should really let concrete cure very thoroughly before putting on a finish and that "very thoroughly" can actually mean "several years".
Has anybody heard if there's any truth in this? Have you had a finish put on your new concrete and later regretted it because of something to do with incomplete curing? Thanks in advance for any helpful replies! |
We are putting in a birdcage, I called Driveways by Jay (does excellent work) and asked him about doing the birdcage like he did our driveway. I told me the "aging" would be one month, then it could be coated.
|
Can tell you that concrete does not take "several years" to cure. If it did it would really slow most home building down.
|
Concrete takes 28 days to cure 100% It is a specific chemical reaction when the portland cement is hydrated ( mixed with water). It doesn't matter whether you pour a patio slab, or dump it in the lake. 28 days later it is 100 % cured.
|
Accurate
Quote:
|
Well, since the house is at least a few months to go, it sounds like the lanai is more than ready to be finished. Thanks all for the quick and helpful replies!
|
All times are GMT -5. The time now is 07:32 PM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Optimisation provided by
DragonByte SEO v2.0.32 (Pro) -
vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.