Southern Oaks north of the Turnpike
Here is link to a flyover of the section of Southern Oaks that is north of the Turnpike from 468 to the Bailey Rd bridge. A huge area, a lot of growth is going to occur in this area!
You can see the markings from the drilling they do at set intervals prior to construction. I've yet to figure out exactly what they are for but consistently they have done this in all the areas before they start construction. If you look at Google for Southern Oaks phases 1, 2, & 3 you can see the markings almost all equally spaced. Southern Oaks north |
I wonder if these are core sample digs? Testing the stability of the sand and checking for sink holes and aquifers...
|
Great video. Thanks.
|
Very cool! I ended up watching several of your videos! Love the bird's eye view!
Thanks for sharing! |
thank you!
|
Percolation Tests
Most likely the holes are percolation test holes. They are required for most construction. A percolation test (colloquially called a perc test) is a test to determine the water absorption rate of soil.
|
All times are GMT -5. The time now is 03:33 PM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by
DragonByte SEO v2.0.32 (Pro) -
vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.