![]() |
A change is coming to Pensacola #9
Heard from an Ambassador that starting 4/9/18, construction will start to build a new green to the right of the existing green (creating a forced carry over water on the 3rd shot) on Bonifay Pensacola #9 and a cartpath will be built, with a turnaround, to eliminate people having to walk down the hill to access the green. That will make an interesting finishing hole.
|
All times are GMT -5. The time now is 10:44 PM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by
DragonByte SEO v2.0.32 (Pro) -
vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.