Bridge over Turnpike detail starting to surface
1 Attachment(s)
A few details can be determined by the attached plans on file of the bridge over the Turnpike.
A single 300' span (unsupported in the middle) 15' wide deck about 20' above the roadway designed for a max golf cart speed of 18 mph (oops!) Towers similar to bridge at Brownwood so likely to look the same only longer. It will be interesting to see how the bridge reacts when a large number of trucks pass under at 75 mph at the same time. According to today's newspaper the Brownwood bridge will be set the week of 18 August. The setting of both bridges will be interesting to watch. |
Going to be wild! It would be great to watch it being set.
|
Quote:
|
Thanks Don, I noticed they have done some work on the MMP near hogeye where the current MMP ends. It looks like they are getting ready to pave. It will be interesting to see when the connectivity will occur.
|
Thanks Don, never been closer!
|
I have to admit to being a bit surprised, at it being a single...300' unsupported span.
I suppose with its relatively light load requirements it will be plenty adequate, but I will personally be curious to see the final installed design...and its arch radius. |
Agree seems like a long span but that’s not my job
|
|
Quote:
|
At the 25 second of the video 232 feet long.
|
All times are GMT -5. The time now is 05:28 PM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Optimisation provided by
DragonByte SEO v2.0.32 (Pro) -
vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.