Construction Update Flyover 10-6-19
Here’s the newest flyover of the areas of The Villages under construction. Between poor flying conditions and teaching at The Enrichment Academy I’ve been a bit overwhelmed and unable to get another video out.
I’m making liberal use of the 4K video and the ability to digital zoom to get some better shots especially of the Turnpike bridge and Water Lilly rec center under construction. I’ve started a twitter feed and next week will start tweeting out when flying for those who may want to come and watch. @Gold_Wingnut I’m also going to take a shot at live streaming on YouTube and Facebook while flying next week. We’ll see how well that actually works. The Villages 10-06-19 Construction Update - YouTube |
Thanks again for another great video. Much appreciated.
|
I was having withdrawal symptoms. Missed you but I understand. You do a great job.
It sure appears that the construction has slowed down just a bit (maybe like 20-30%). Do you feel that way? |
Great video and narration. Hope TV doesn't put another smackdown on you for pointing the longer cart access..
Wendy's can't open because they have no employees.. lol |
Quote:
If these guys were any indication, I would say that construction hasn't slowed a bit. |
Thanks for another informative video Don!
The construction velocity is amazing, from slab to concrete block walls to under roof in less than a week. I especially appreciated your shout out to people doing the hard work building the homes. |
Don..Have you heard anything about the turnpike bridge lately?
|
Quote:
|
Quote:
After watching GWN's video, I immediately went and watched the October VMail. I guess the rumor's are official now, because in the video they mention April/May for connectivity, even though, as GWN points out in his video, less than a year ago they were saying January 2020 for full connectivity. No reasons or excuses given. There has been a rumor floating for a couple months now that connectivity wouldn't be until spring. But the VMail is the first "official" communication I have seen that confirms that rumor. The other part of the rumor was that FDOT was the reason for the delay, but as stated previously, no reasons or excuses were given and there was not even an acknowledgement that the current schedule is different from what the previous timeline was. We'll all survive with the connectivity delay. Delays happen. With construction this rapid and widespread, it's a wonder there aren't other delays. The lack of transparency with the reasons for the delay and/or even acknowledging the delay bugs me more than the delay itself. The Vmail simply states that it will be April/May as if that has just been the plan all along. |
Great video, as usual. I do have one thing to point out, though. Your admonitions about avoiding the "no trespassing" areas are good, but they are having open houses within areas that say no trespassing. This has been going on for weeks. Especially the section that includes Hinckey Ave., running parallel to the turnpike. In order to get back there, you have to go right past (sometimes multiple) "No Trespassing" signs. There are other areas in Monarch Grove where we have witnessed the same thing. It gets confusing, and lessens the credibility of such signage.
|
Quote:
|
Thank you for the videos! We appreciate the updates and the 9/16 side-by-side. Can't move to McClure yet but your videos help us feel some connection while we're stuck in CO (high temp today - 29 degrees).
|
The only thing that bugs me is them whining about using their maps. After all you do for them, and as cooperative as you are, they won't let you show a MAP? Seriously. That is really petty. Sounds like lawyers to me.
|
All times are GMT -5. The time now is 07:40 PM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Search Engine Optimisation provided by
DragonByte SEO v2.0.32 (Pro) -
vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.