Making a Change While Building
As anyone ever made a change in the middle of building their house? I am second guessing myself about not getting Corian or granite for our kitchen. :undecided: BTW, the house is not close to being ready for anything in the kitchen yet. We just got walls.
|
Quote:
You might want to check and see if the fine is big enough to have them finish the job and then redo the counters. |
I think our realtor said something about $250 per change. That's not too bad if I knew the cost to upgrade to Corian. We might be able to absorb the fine but good point to maybe just wait and get it done later. Thanks! :smiley:
|
Change
Last year when our hpuse was being built we asked about changing the outside color. We offered to pay whatever fee was involved. We got a flat out no way.You'll get what you signed for. At the time the house was not even close to painting stage.
|
Making a Change While Building
We replaced our old counter tops with Corian in May.
Estimated cost by $3300.00 The work was done by a certified Corian supplier. |
All times are GMT -5. The time now is 12:20 PM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by
DragonByte SEO v2.0.32 (Pro) -
vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.