![]() |
Construction Update flyover 4/1/20
Here’s the latest construction update video. This includes a fly from the Everglades Rec Center all the way to Brownwood. More of Marsh Bend Trail opened up this past week allowing me to have line of sight on the drone for the last segment that was previously unreachable. This was shot on April 1st and some of it about 10 days before.
There’s lots of progress in Chitty Chatty, Bradford, De Luna, and even some progress at Magnolia Plaza. The Chitty Chatty bridge and Water Lily turnpike bridge are also showing progress. The Villages 4-01-20 Construction Update and Everglades to Brownwood Fly - YouTube |
Thanks
Thanks for another outstanding video!
|
Thanks again, Don. Great stuff.
|
Thank you!
|
Thank you!
|
Thank you Don.
|
Thanks for doing these. Have you seen any interest from the Villages on your idea for golf car crossing the turnpike on Warm Springs bridge?
|
Thank you for all your hard work
Another great update. Very well done. Highly informative as well as entertaining. Thank you, as always. Be well Sir.
|
Thanks again for another great video! This one was special because for a short time I thought of how live is still moving forward here in The Villages.
|
Love this! Thank you
:bigbow::bigbow::bigbow::bigbow:
Quote:
|
Wow that was great :bigbow:
That gave me the best idea of how it is shaping up and especially the proximity to the rest of TV |
All times are GMT -5. The time now is 07:48 AM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by
DragonByte SEO v2.0.32 (Pro) -
vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.