How is the Water Lily bridge progressing?
I have been gone for the last month and a half. I just read about Brownwood bridge and Meggison road opening. Have any of you been by Water Lily recently? Thanks
|
They've made a lot of progress, much of the approach ramps and the connection over the pipeline is in place.
Relative to what I saw for the Chitty Chatty bridge, I would not be surprised if it opened Feb/March. Others may have a better idea. |
1 Attachment(s)
Quote:
|
Picture
Thanks for the picture
|
Now that the Brownwood Bridge (and Meggison) is open you can drive and watch the progress. Wide open spaces now but give it a few months, it is a fun ride.
|
I'm very close to the second cousin of the bag boy who works at The Publix located on SR44, who spent his winter break with the foreman in charge of the final construction phase of the bridge who advised him that the projected completion date of the Water Lily bridge is currently Friday, February 5th, 2021, subject to change.......
|
You are so full of it! His cousins sister, heard they moved it to March 10th. :)
I’ll believe it - when I see it! |
Did the bag boy ever marry that cashier Eunice?
|
1 Attachment(s)
Here's a shot from the south side taken Christmas morning. They've now set the precast spans that bridge the gas pipeline in place, so it looks like all the heavy lifting is done. Ramp work making good progress as well.
(may need to click to expand) Attachment 87479 |
Water Lilly bridge
Quote:
|
:1rotfl::1rotfl::1rotfl:
:coolsmiley: Quote:
|
No, that opens February 6th! :1rotfl::1rotfl: Trader Joe's on the 7th!
Quote:
|
just waiting for the toll booth to be put in place.
|
Quote:
|
All times are GMT -5. The time now is 12:40 PM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by
DragonByte SEO v2.0.32 (Pro) -
vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.