Building permit approval
 
Building permit approval

I had a permit from the architectural committee to build a porch on my courtyard villa. It is now complete and I have the permit on my front door. It’s been two days now how long does it take to have the inspector come out to approve the work?

Tmarkwald 02-25-2021 01:04 PM

Have you called them? They should be able to tell you.

EdFNJ 02-25-2021 02:14 PM

Quote:

Originally Posted by Iowagirl2 (Post 1907913)
Building permit approval

I had a permit from the architectural committee to build a porch on my courtyard villa. It is now complete and I have the permit on my front door. It’s been two days now how long does it take to have the inspector come out to approve the work?

From our experience with an addition YOU have to call them or how would they know you're ready? We had to have 3 different inspections at various phases then a final.

Edit: You may not even need a visit. Usually that's when you require county permits (electrical, plumbing, framing etc). I always thought ARC approval only OK's the design and it is up to you/your contractor to get any required county permits.

Stu from NYC 02-25-2021 02:22 PM

For whatever it is worth when we had our Florida room done some months ago our contractor contacted Sumter County to arrange inspections.

villagetinker 02-26-2021 09:01 AM

Quote:

Originally Posted by Iowagirl2 (Post 1907913)
Building permit approval

I had a permit from the architectural committee to build a porch on my courtyard villa. It is now complete and I have the permit on my front door. It’s been two days now how long does it take to have the inspector come out to approve the work?

Just a clarification, you get an APPROVAL from ARC, permits are pulled by the contractor(s) and they are responsible for getting all of the inspections, then you should get a set of papers (forms) from the contractor with all of the permits and inspections signed off. If you did not get these IMHO, call the building department and find out what happened. I got caught on this once when a contractor did NOT gets the required permits, found out 18 months later during another project. Good luck.

jpvillager 02-26-2021 12:56 PM

With anything needing an inspection such as a new roof or additions it's a good idea not to pay or at least make final payment until after the inspection is complete. Otherwise you loose a lot of leverage on getting corrections if it fails. Had a door to door driveway paver brick cleaner sander re-sealer in the neighborhood. I didn't hire but a neighbor did ( no inspection required). He skipped out with their money after apply 1 coat or re-sealer on an agreed upon 2 coat job. He then had the nerve to come back to me looking to do mine. I told him when he finishes their job come back and talk to me. He nerve finished it and we never say him again.

Garywt 02-26-2021 03:40 PM

Are you saying that the deck was built in the 2 days you had approval? You do need to call whoever you need an inspection from.


All times are GMT -5. The time now is 05:05 AM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO v2.0.32 (Pro) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.