![]() |
Sawgrass Grove by golf cart to Magnolia Plaza
Is there going to be a way to get to Magnolia Plaza by cart (near Warm Springs and Megisson)? Right now we have to drive all the way to the Waterlily bridge down by Brownwood, and then all the way back. I don't know if the Bexley bridge would resolve that.
|
Quote:
|
Quote:
|
I asked a real estate agent when Bexley will be finished. He said spring 2023. That seems a bit slow. It only took 13.5 months to build the Empire State Building. Does anyone know how long it took to build the other bridges? From start to finish?
|
Quote:
John Stossel did a great piece on just that... Classic Stossel: Regulation Overload with Peter Thiel - YouTube |
Having to deal with the Turnpike Authority muddies the water considerably.
|
It’s different than all the other bridges they have built, this 1 is for both cars and golf carts
|
Bridge
[QUOTE=rsmurano;2026196]It’s different than all the other bridges they have built, this 1 is for both cars and golf carts[/QUOTE
Because the bridge will carry cars the state will not let TV build it. The state will contract and oversee construction and theTV Pays the cost. That will most likely cause delays. |
Time to call Ron! ;o)
|
I go all the way down Morse cart trail over the Chitty Chatty bridge to Meggison to Magnolia Plaza.
Sorry. Disregard. Wrong Area I was thinking of.:ohdear::duck: |
All times are GMT -5. The time now is 09:51 PM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by
DragonByte SEO v2.0.32 (Pro) -
vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.