![]() |
Paradise Rec Center Status March 8 2023
Paradise Recreation Project Status
• Concept Design, which is based on existing Regional Recreation Center plans. Adds 10,000 Square Feet to current Paradise Footprint & eliminates multiple elevation floorplans; • Potentially save $400-500K by utilizing already approved Regional Recreation Center construction plans (with some modifications to enhance views & expand/optimize space use & layout); • Adds New Amenities: Natural Gas Fire Pit with Lake Overlook & Picnic Area, Walking Trail, and a Resort Style Pool; • Provides dramatic views and overlook areas above Golfview Lake; • Preserves all of the historic majestic Live Oaks; • Improves grade and functionality of all interior spaces; • Maximize the views over the lake (fire pit, expanded seating and picnic areas, large plate glass overlook windows in key areas); • Expands the Mark Twain Library Space; • Maintains the Spanish architecture and historic look and feel of the original Paradise Recreation Center |
All times are GMT -5. The time now is 03:45 PM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by
DragonByte SEO v2.0.32 (Pro) -
vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.