Talk of The Villages Florida

Talk of The Villages Florida (https://www.talkofthevillages.com/forums/)
-   Contractors and Services (https://www.talkofthevillages.com/forums/contractors-services-91/)
-   -   Gil Rivera - JVJetta - anyone use him? (https://www.talkofthevillages.com/forums/contractors-services-91/gil-rivera-jvjetta-anyone-use-him-95256/)

villager 11-16-2013 04:45 PM

Gil Rivera - JVJetta - anyone use him?
 
Has anyone used Gil Rivera to do any work on their home? He does kitchen and bath remodels, granite, quartz and solid surfacing counter tops and walls, cabinetry, flooring and painting. I'd love to hear any feedback, good or bad. Thanks in advance!

aln 11-16-2013 08:20 PM

1 Attachment(s)
We used him for a total kitchen remodel.

Tile floor - great
Granite counter - very good
Backsplash - very good
Sink & faucet - very good
Removed old wallpaper & painted - very good
Removed popcorn ceiling & applied 'knockdown' texture very good EXCEPT we have a plexiglass skylite which got some texture on and cleanup was poor.
Cabinets - good - partially our fault as we went on the low end of the price spectrum
New molding throughout kitchen, family room, and front room - very good
Price & timing of all - good
If you have any specific questions, send me a private message.

villager 11-16-2013 08:24 PM

Your new kitchen looks great aln. Thanks for the feedback!

OurHappyHome 11-16-2013 11:45 PM

He did work on our home. It was terrible. We had to call in another contractor to fix it. It cost me thousands more, and I lost over a month use of the home. It was so bad we couldn't even live there.

villager 11-17-2013 07:24 PM

Wow - two total opposite comments. Anybody have any more to offer?

OldManTime 11-18-2013 09:46 AM

He is 1st class!

gmracket 11-18-2013 10:18 AM

We had Gil remodel our shower with the jetta stone and then he did granite countertops in both the baths and the kitchen. He is a very honest and his prices are comparatively lower then other contractors. He was much less then Wildwood Kitchens and Bath. He had it done in a total of 2 weeks. He tries to keep his promises barring any unforeseen problems. I'm sorry to hear that someone had a problem with him. Seems hard to believe.

If I where you I would have him in for a estimate, be honest with him in what you want and I think you'll be pleasantly surprised.

villager 11-18-2013 08:09 PM

What did he do for you OldManTime?

Leesburg 11-25-2013 10:20 AM

We are very happy with our granite counter tops, but not so happy with our tile. Many pieces were cut short and the installer used a lot of grout to fill in the spaces. I think thebaseboardsshould have been removed. The metal strips weren't removed where carpet and tile meet and it will require a lot of grout.

sam&rog 01-06-2014 04:45 PM

terrible job on bath. 3 weeks and had to redo it. beware


All times are GMT -5. The time now is 06:04 AM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO v2.0.32 (Pro) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.