Advice/Rec's - Add 1/2 Bath
  #1  
Old 12-12-2016, 01:52 PM
JEB01 JEB01 is offline
Junior Member
 
Join Date: Apr 2014
Posts: 10
Thanks: 0
Thanked 0 Times in 0 Posts
Default Advice/Rec's - Add 1/2 Bath

I am considering adding a 1/2 bath to my Villages house. Looking for thoughts about advisability and do's/don'ts from those who have experience. If you have a contractor you can recommend, please pass that along. Thanks in advance.

  #2  
Old 12-12-2016, 02:24 PM
villagetinker's Avatar
villagetinker villagetinker is online now
Sage
 
Join Date: Sep 2013
Location: Village of Pinellas
Posts: 5,418
Thanks: 0
Thanked 55 Times in 43 Posts
Default

Wow, this sounds like an interesting project. With almost all of the plumbing in the slab this could be very expensive unless your 1/2 bath backs up to an existing bathroom, this could get easy access to hot and cold water and a sink drain, but you will still need to get the drain connection for the toilet. I will be very interested in the replies. Good luck with your project.
__________________
Pennsylvania, for 60+ years, most recently, Allentown, now TV.
Sponsored Links
  #3  
Old 12-12-2016, 02:50 PM
dewilson58's Avatar
dewilson58 dewilson58 is offline
Sage
 
Join Date: May 2013
Location: South of 466a, if you don't like me.......I live in Orlando.
Posts: 4,792
Thanks: 66
Thanked 298 Times in 153 Posts
Default

Very doable. Look at contractor websites.......Like Advance, or XCel Construction or PSL or T&D.........they give capabilities and show past projects.

I disagree you have to back up to a current bath, you just need access to the hot/cold water and drain. There is access locations other than under the slap or another bath. A lot of times you can access the water from the garage.

Obviously, always interview and get references.

Good Luck.
  #4  
Old 12-12-2016, 05:39 PM
villagetinker's Avatar
villagetinker villagetinker is online now
Sage
 
Join Date: Sep 2013
Location: Village of Pinellas
Posts: 5,418
Thanks: 0
Thanked 55 Times in 43 Posts
Default

Quote:
Originally Posted by dewilson58 View Post
Very doable. Look at contractor websites.......Like Advance, or XCel Construction or PSL or T&D.........they give capabilities and show past projects.

I disagree you have to back up to a current bath, you just need access to the hot/cold water and drain. There is access locations other than under the slap or another bath. A lot of times you can access the water from the garage.

Obviously, always interview and get references.

Good Luck.
I agree with your comments, I was assuming that the 1/2 bath was on the opposite side of the house from the garage, and getting the water supplies would be problematic. I was coming from the layout of our house, where this would be difficult at best.
Upon additional reflection, if the OP is lucky, and the waste drain is on the same side of the house as the new 1/2 bath, then it might be possible to have the new toilet drain go through the slab and outside to the existing drain line, not sure about getting through the foundation. Also, if the other bathroom is on an adjacent wall then the water supplies and sink drain could be shared, JMHO.
I would get 3 estimates, with specific lists of what is to be done, and expected payment schedules, nothing up front. Construction must get ALL of the required permits.
Good luck.
__________________
Pennsylvania, for 60+ years, most recently, Allentown, now TV.
  #5  
Old 12-13-2016, 12:03 PM
JEB01 JEB01 is offline
Junior Member
 
Join Date: Apr 2014
Posts: 10
Thanks: 0
Thanked 0 Times in 0 Posts
Default

Thanks so much for taking the time to comment. If we go forward, I will return to the site and let you know.
  #6  
Old 12-13-2016, 12:04 PM
JEB01 JEB01 is offline
Junior Member
 
Join Date: Apr 2014
Posts: 10
Thanks: 0
Thanked 0 Times in 0 Posts
Default

Thank you for taking the time to reply. If we go forward with the idea, I'll return and share comments about the experience.
Closed Thread

Tags
bath, 1/2, experience, advance, contractor

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 05:05 PM.