466 and Morse construction

Closed Thread
Thread Tools
  #1  
Old 06-03-2021, 07:37 AM
delima2000 delima2000 is offline
Veteran member
Join Date: Feb 2012
Location: Mira Mesa
Posts: 613
Thanks: 10
Thanked 59 Times in 26 Posts
Default 466 and Morse construction

Has the construction started yet? If it has how is the traffic flow?
  #2  
Old 06-03-2021, 08:34 AM
Bogie Shooter Bogie Shooter is online now
Sage
Join Date: Sep 2008
Posts: 18,858
Thanks: 10
Thanked 5,359 Times in 2,393 Posts
Default

Signs are up. Appears some utility work has begun.
__________________
The further a society drifts from truth the more it will hate those who speak it. George Orwell.
“Only truth and transparency can guarantee freedom”, John McCain
Closed Thread

Tags
construction, morse, started, traffic, flow


You are viewing a new design of the TOTV site. Click here to revert to the old version.

All times are GMT -5. The time now is 04:11 PM.