Originally Posted by mulligan View Post
Generally, there are 2 choices in reinforcement of building slabs in Florida. Steel mesh, usually 8x8 squares of welded #10 wire, with added 1/2 or 5/8 steel bar at the perimeter, or perimeter bars with fiberglass in the mix (sometimes called fibercrete). Both can be engineered to provide correct support and finished surface. This is really an oversimplification, but the general idea applies.
Thanks Mulligan, that answer my question. I knew the codes here were different than S Fla. due to different conditions, but that explains concrete to my satisfaction.
__________________
Les
  #17  
Old 07-15-2011, 12:30 PM
batman911's Avatar
batman911 batman911 is offline
Gold member
Join Date: Sep 2008
Location: The Villages, FL
Posts: 1,337
Thanks: 0
Thanked 2 Times in 1 Post
Default

I worked in construction during the Summers when I was still in school. I remember that someone always sampled the concrete coming out of the truck when we poured a slab or any concrete structure. There are different grades of concrete (rated in pounds of pressure (PSI)) that are used according to the architects specifications. I believe it may have been the architectual firm that was sampling the concrete.
  #18  
Old 07-15-2011, 02:55 PM
rubicon rubicon is offline
Email Reported As Spam
Join Date: Nov 2010
Posts: 13,694
Thanks: 0
Thanked 13 Times in 11 Posts
Default

Quote:
Originally Posted by mulligan View Post
Generally, there are 2 choices in reinforcement of building slabs in Florida. Steel mesh, usually 8x8 squares of welded #10 wire, with added 1/2 or 5/8 steel bar at the perimeter, or perimeter bars with fiberglass in the mix (sometimes called fibercrete). Both can be engineered to provide correct support and finished surface. This is really an oversimplification, but the general idea applies.
Do you know if The Villages builders are using either one of these reinforcement methods or none ? Also I noticed that builders pour the slab and immediately begin building on it. Does the concrete need time to cure and dry? If so for how long?
  #19  
Old 07-15-2011, 04:18 PM
Shimpy's Avatar
Shimpy Shimpy is offline
Sage
Join Date: Aug 2008
Posts: 2,735
Thanks: 4
Thanked 24 Times in 19 Posts
Default

Quote:
Originally Posted by mulligan View Post
Generally, there are 2 choices in reinforcement of building slabs in Florida. Steel mesh, usually 8x8 squares of welded #10 wire, with added 1/2 or 5/8 steel bar at the perimeter, or perimeter bars with fiberglass in the mix (sometimes called fibercrete). Both can be engineered to provide correct support and finished surface. This is really an oversimplification, but the general idea applies.
I just took a close look and did see re-bar in the footer.
__________________
Les
  #20  
Old 07-16-2011, 01:41 PM
batman911's Avatar
batman911 batman911 is offline
Gold member
Join Date: Sep 2008
Location: The Villages, FL
Posts: 1,337
Thanks: 0
Thanked 2 Times in 1 Post
Default

Rubicon,

Concrete setting times:

http://powerblanket.com/2008/01/31/t...-setting-time/

and you can add accellerators to speed up the set time:

http://www.fhwa.dot.gov/infrastructu...p/acclerat.htm