Talk of The Villages Florida

Talk of The Villages Florida (https://www.talkofthevillages.com/forums/)
-   The Villages, Florida, General Discussion (https://www.talkofthevillages.com/forums/villages-florida-general-discussion-73/)
-   -   Golf cart path to Brownwood from Marsh Bend (https://www.talkofthevillages.com/forums/villages-florida-general-discussion-73/golf-cart-path-brownwood-marsh-bend-303549/)

skip0358 03-07-2020 03:26 PM

How many Roadways, Bridges & Buildings in Florida and for that matter all states are completed on time. Bet you could count them on 1 hand. You have a car be happy so it's a little drive by car. When the bridges and paths are complete it's going to take longer then in your car to get where you want to get unless you have one of those souped up illegal golf carts. As for the shopping center it till will come in time. Moved here fulltime in 09 was told building will stop at 466a. Don't think all my furniture was moved in and they were clearing property south of 466a. Everything will come be patient we're on our final journey and I'm in no hurry to see the end of it.

crydzanich 03-07-2020 04:44 PM

Funny
 
That’s funny. When we decided to move here in 1999, we were told there wasn’t going to be anything beyond 466. See how that worked out!

dewilson58 03-07-2020 04:52 PM

Quote:

Originally Posted by crydzanich (Post 1725201)
That’s funny. When we decided to move here in 1999, we were told there wasn’t going to be anything beyond 466. See how that worked out!




:bigbow:

ValSetz 03-08-2020 05:33 AM

No. 44 was to end with 110,000 people. I moved last straw was Pineridge in Lake near Colony.

Mmarr 03-08-2020 06:28 AM

Villages sales agents are not construction people..
Your wait time is what it is.. best bet another yr or could be more..

Bay Kid 03-08-2020 06:57 AM

I am on the list for golf cart parking at the Orlando airport.

merrymini 03-08-2020 07:45 AM

They are a company that makes money and will continue to sell their product until it stops making money. The real issue going forward will be water and is there going to be enough for all these people.

dwhite5773 03-08-2020 08:10 AM

Quote:

Originally Posted by champion6 (Post 1724948)
This attachment was published in the Feb. 28 Daily Sun. Presumably, these details are straight from the developer's mouth.

That’s hilarious!!

LuLinn 03-08-2020 08:13 AM

Thank you

dwhite5773 03-08-2020 08:16 AM

Quote:

Originally Posted by WalkerLoop (Post 1725056)
There is no specific information about when the MMPs will be available. I'm pretty sure that the key factor in their construction is the development of Villages and roads (that Sumter County builds) south of route 44. After the roads are built, the MMPs that run beside them will be constructed. The primary reason that it is taking so long for the bridges to be finished is that they currently would have no links to any MMPs south of route 44. The work they are doing on the bridges could be done in a much, much shorter time but since no MMPs, they are working very slowly.

Do you live here? There are miles of MPP’s in Marsh Bend, Linden, Monarch Grove! Wrong answer!

rjcataniajr 03-08-2020 08:18 AM

and we were told in 2004 that the build out would be 210

Marykess1802 03-08-2020 09:01 AM

MCO golf cart parking
 
Quote:

Originally Posted by Bay Kid (Post 1725267)
I am on the list for golf cart parking at the Orlando airport.

Better get the super-extended-range model LOL

Matthew Wag 03-08-2020 09:08 AM

Brownwood bridge
 
I plan to move in May to DeLuna I was told it would be done then! I am learning these developers are turning out to be liers. Maybe we should introduce a class action lawsuit to stop the lying! I expected to be told the truth! Same with the Magnolia plaza, I was told both would be completed by May 2020! Any good lawyers out there? How about we not pay our CCD fees until projects are completed when they tell us!

WalkerLoop 03-08-2020 09:20 AM

True, but they do not go North towards Route 44 yet. The connections between those MMPs/roads and the Route 44 bridges is required for them to finish the MPPs that connect to the South. I'm not talking about the overall number and length of MPPs in the Southern area. It's the connectors to the North that are required.

vintageogauge 03-08-2020 09:44 AM

Quote:

Originally Posted by WalkerLoop (Post 1725326)
True, but they do not go North towards Route 44 yet. The connections between those MMPs/roads and the Route 44 bridges is required for them to finish the MPPs that connect to the South. I'm not talking about the overall number and length of MPPs in the Southern area. It's the connectors to the North that are required.

There is no rush to complete the ramps for the Paddock Square bridge as there is nowhere to go until they get the bridge across the turnpike completed. That entire area from 44 down to Warm Springs east of the Turnpike is undeveloped and to get over to Southern Oaks and Fenney you need to cross the turnpike so that connection is at a standstill until the turnpike bridge is erected. Chitty Chatty is now working on the MMP's to connect to the Rohan/Lake Deaton Plaza bridge after it's erected so I would say that will be the first connection but it's a very long golf car ride to Paddock Square as you have to go all the way up to Moyer to go west. It will be even longer from Bradford.


All times are GMT -5. The time now is 12:24 PM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Search Engine Optimisation provided by DragonByte SEO v2.0.32 (Pro) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.