Latest update on the CR101 cart tunnel repairs

Closed Thread
Thread Tools
  #1  
Old 11-16-2011, 09:23 PM
Bill-n-Brillo's Avatar
Bill-n-Brillo Bill-n-Brillo is offline
Sage
Join Date: Sep 2010
Location: Granville, OH.....and TV snowflakes!
Posts: 6,905
Thanks: 0
Thanked 2 Times in 2 Posts
Default Latest update on the CR101 cart tunnel repairs

From www.districtgov.org :

"Status Update - CR101 Tunnel Closure 11/16/11
The support footers have been poured to receive the repair spans. Installation of the spans will begin Saturday, November 19, 2011. The re-work on the tunnel approaches is expected to happen the second week in December. As the work commences please continue to use caution at the temporary four-way stop located north of the closed tunnel, where golf carts are currently allowed to cross CR101. Please visit the District website, www.districtgov.org for updates on the progress of the CR101 Tunnel Project. "

Bill
  #2  
Old 11-16-2011, 10:02 PM
REDCART REDCART is offline
Platinum member
Join Date: Mar 2007
Posts: 1,879
Thanks: 112
Thanked 193 Times in 92 Posts
Default

At the Tuesday's POA meeting, someone asked whether CD3 was going to have to pay the cost of the CR101 tunnel repair. According to Janet Tutt, the entire cost of the tunnel replacement, including lowering the tunnel floor by one foot, and regrading the ramps will be paid by the tunnel manufacturer. CDD3 will not have to pay anything, and the mfr will also extend the current warranty on this new work.
  #3  
Old 11-17-2011, 06:02 AM
hedoman's Avatar
hedoman hedoman is offline
Veteran member
Join Date: Sep 2009
Location: Polo Ridge
Posts: 611
Thanks: 0
Thanked 2 Times in 2 Posts
Default

We see/hear them working round the clock.....
__________________
PA, NJ, CT, NC - Polo Ridge 2011

"The difficult we can do immediately the impossible just takes a little longer"
  #4  
Old 11-17-2011, 07:50 AM
nitehawk nitehawk is offline
Gold member
Join Date: Mar 2007
Location: Newark, NJ - Villages
Posts: 1,193
Thanks: 0
Thanked 1 Time in 1 Post
Default

Quote:
Originally Posted by hedoman View Post
We see/hear them working round the clock.....
  #5  
Old 12-18-2011, 05:56 AM
hedoman's Avatar
hedoman hedoman is offline
Veteran member
Join Date: Sep 2009
Location: Polo Ridge
Posts: 611
Thanks: 0
Thanked 2 Times in 2 Posts
Default 101 Tunnel looks almost complete

Went to Gandolfos last evening so dropped over to see the progress on the 101 tunnel. It looks ready to go, new sleeve in, new concrete in the road bed (which had to be lowered due to the new sleeve. ) Looks like brand new concrete and they are giving it extra days to cure. A few cans of contractor stuff lying around but we think it should be open shortly (maybe pending inspection?)

anybody priviy to the opening day?
__________________
PA, NJ, CT, NC - Polo Ridge 2011

"The difficult we can do immediately the impossible just takes a little longer"
  #6  
Old 12-18-2011, 09:30 PM
Bill-n-Brillo's Avatar
Bill-n-Brillo Bill-n-Brillo is offline
Sage
Join Date: Sep 2010
Location: Granville, OH.....and TV snowflakes!
Posts: 6,905
Thanks: 0
Thanked 2 Times in 2 Posts
Default

Saw the same stuff yesterday as well, hedoman. A couple of workers were there cleaning up - one was spraying water on the new concrete to help slow down the curing. I'd guess it'll be probably 7-10 days (at a minimum) from when they poured before they open it up.

Bill
  #7  
Old 12-18-2011, 11:28 PM
CarGuys's Avatar
CarGuys CarGuys is offline
Gold member
Join Date: Dec 2010
Posts: 1,348
Thanks: 0
Thanked 0 Times in 0 Posts
Default Liner

Did they put in a Steel or another Concreate liner?

Must have been quite a operation to watch.
  #8  
Old 12-19-2011, 12:16 AM
Ooper's Avatar
Ooper Ooper is offline
Platinum member
Join Date: Jun 2007
Posts: 1,534
Thanks: 0
Thanked 14 Times in 6 Posts
Default

Looks like a ribbed steel liner. Everything look really nice. Looks like all that is left is some cosmetic curbing and landscaping.
__________________
Oswego, NY
Love The Villages
  #9  
Old 12-19-2011, 12:31 AM
CarGuys's Avatar
CarGuys CarGuys is offline
Gold member
Join Date: Dec 2010
Posts: 1,348
Thanks: 0
Thanked 0 Times in 0 Posts
Default Secure

That should make it very safe and secure. Are all the original ones cement?

As we all know cement can crack and open up for water intrusion.

The Steel Liner repair seems like a good fix?
  #10  
Old 12-19-2011, 06:36 AM
rhood rhood is offline
Veteran member
Join Date: Sep 2011
Posts: 661
Thanks: 3
Thanked 148 Times in 62 Posts
Default

Quote:
Originally Posted by hedoman View Post
Went to Gandolfos last evening so dropped over to see the progress on the 101 tunnel. It looks ready to go, new sleeve in, new concrete in the road bed (which had to be lowered due to the new sleeve. ) Looks like brand new concrete and they are giving it extra days to cure. A few cans of contractor stuff lying around but we think it should be open shortly (maybe pending inspection?)

anybody priviy to the opening day?
Inspection ? ? ? That will probably take another month or so by multiple agencies ! !
  #11  
Old 12-19-2011, 08:18 AM
nitehawk nitehawk is offline
Gold member
Join Date: Mar 2007
Location: Newark, NJ - Villages
Posts: 1,193
Thanks: 0
Thanked 1 Time in 1 Post
Default

Quote:
Originally Posted by rhood View Post
Inspection ? ? ? That will probably take another month or so by multiple agencies ! !
Should have left it the way it was - the 4 way stop sign worked fine. Maybe a 4 way stop sign for Rolling Acres Road.
  #12  
Old 12-19-2011, 03:42 PM
Bogie Shooter Bogie Shooter is offline
Sage
Join Date: Sep 2008
Posts: 18,860
Thanks: 10
Thanked 5,361 Times in 2,394 Posts
Default

Quote:
Originally Posted by nitehawk View Post
Should have left it the way it was - the 4 way stop sign worked fine. Maybe a 4 way stop sign for Rolling Acres Road.
Where on Rolling Acres Road??
  #13  
Old 12-20-2011, 09:56 AM
nitehawk nitehawk is offline
Gold member
Join Date: Mar 2007
Location: Newark, NJ - Villages
Posts: 1,193
Thanks: 0
Thanked 1 Time in 1 Post
Default

Quote:
Originally Posted by Bogie Shooter View Post
Where on Rolling Acres Road??
http://maps.google.com/maps/ms?msa=0...h&z=19&vpsrc=6

Where Rex Drive is --- Either a 4 way stop or a red and green light --- rolling acres rd is 35 mph - just like 472 (Lynnhaven and Mona Shores Dr) which is ok to cross. Also on where Gazaras and Co Rd 109 cross El Camino Real also 35 mph and there is a light there.
  #14  
Old 12-20-2011, 10:06 AM
Ooper's Avatar
Ooper Ooper is offline
Platinum member
Join Date: Jun 2007
Posts: 1,534
Thanks: 0
Thanked 14 Times in 6 Posts
Default

Y'all are assuming that just because you want a 4-way stop ot a light at these intersections, golf carts will be allowed to cross. Not necessarily... I believe that would have to be passed by the Lady Lake Township.
__________________
Oswego, NY
Love The Villages
  #15  
Old 12-20-2011, 03:26 PM
elevatorman elevatorman is offline
Veteran member
Join Date: Oct 2008
Location: The Village Duval
Posts: 919
Thanks: 25
Thanked 133 Times in 65 Posts
Red face

The Tunnel under CR101 is scheduled to re-open mid-morning on Friday, December 23, 2011.